Huawei AP8030DN Installation And Maintenance Manual page 72

Hide thumbs Also See for AP8030DN:
Table of Contents

Advertisement

Huawei AP8030DN & AP8130DN
Hardware Installation and Maintenance Guide
Figure 5-39 Testing the conduction and connections of wires
Step 3 Gently shake the connector and repeat
good contact with the core wires and Ethernet ports, as shown in
Figure 5-40 Checking the reliability
The procedure for testing a crossover cable is the same as that for testing a straight-through cable
except for the sequence in which the indicators turn on. You need to refer to the wire connections
of a crossover cable.
The Ethernet cable is qualified if the indicators turn on in the following sequence:
At the master (left) section of the tester, the indicators turn on in the sequence of 1-8-G. At the
slave (right) section of the tester, the indicators turn on in the sequence of 3-6-1-4-5-2-7-8-G.
Otherwise, the Ethernet cable is unqualified.
Issue 02 (2014-12-05)
Step 2
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
to check whether the metal contact strips are in
Figure
5 Appendix
5-40.
66

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8130dn

Table of Contents