Daikin 2MXS-N Series Service Manual page 196

Hide thumbs Also See for 2MXS-N Series:
Table of Contents

Advertisement

Trial Operation
How to check airflow direction
How to deactivate test operation
BRC7E830
184
Step
Action
8
Push the Menu/OK button to enter the Main
Menu.
9
Use the
buttons to select Airflow
Direction and push the Menu/OK button.
10
Check that the airflow direction is actuated
according to the setting and push the Menu/OK
button.
11
Press and hold the Cancel button for 4
seconds to enter the Service Settings menu.
12
Use the
buttons to select Test Operation
in the menu and push the Menu/OK button.
Step
Action
1
Turn on the power supply more than 6 hours before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
4
Set to cooling operation with the remote controller and start operation by pressing ON/OFF
button.
5
Press the INSPECTION/TEST button (
for 3 minutes.
6
Press the SWING button to make sure the unit is in operation.
7
Press the INSPECTION/TEST button (
8
Confirm all the function of unit according to the operation manual.
9
If the decoration panel has not been installed, turn off the power after the test operation.
Remote controller
) 2 times and operate at test operation mode
/TEST
) and operate normally.
/TEST
Trial Operation and Field Settings
SiUS121502E
(R18829)
(R18830)
(R18827)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3mxs-n series4mxs-n series

Table of Contents