Integral DVXi TS4 User Manual page 77

Table of Contents

Advertisement

CLEARING SCHEDULES
In addition to changing schedules, you can also clear certain schedules using the
Clear Schedule area of the Schedule page (see Figure 32). The Clear Schedule
area contains three choices:
To activate one of these options, select it from the drop-down list and click Clear.
In a special situation in which you need to make only one custom schedule follow
a default schedule, display that day, choose Current Day Only, copy the appropri-
ate default schedule from another day, and paste it to the newly cleared schedule.
Figure 32
The three options in
the Clear Schedule
list box allow you to
clear certain types
of schedules or all
schedules.
Tip
74
Current Day Only—completely clears the displayed schedule. The dis-
played schedule remains or becomes a custom schedule.
All Custom Schedules—causes all custom schedules to become the ap-
propriate default schedule for that type of day (weekday, weekend, or
everyday).
Entire Schedule—completely clears all default and custom schedules.
There are two important features you should activate so that
MasterControl will restart in the case it is improperly shut down,
such as in the event of a power failure. The Automatically Run This
Schedule On Startup option restarts recording whenever
MasterControl is started. Also, you should keep MasterControl in
the Windows Startup folder (where it is placed during installation)
so that it starts whenever the DVXi system is started.
With both features activated, recording restarts in User mode (when
power returns) with no password required. Then, if a user needs to
log in with Supervisor or Administrator permissions, click the Inte-
gral Technologies logo and then the Logon button.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dvxi tbs4

Table of Contents