Signal Board Replacement - Barco E-2320 C Service Manual

Nio 2-3-5 mp
Hide thumbs Also See for E-2320 C:
Table of Contents

Advertisement

6.5 Signal board replacement

6.5.1 Read and save display parameters
To read the EDID PROM contents:
To read out the EEPROM data:
About the Nio 2MP EDID PROM
6.5.2 Remove foot
Proceed as follows:
6.5.3 Remove plastic rear cover
Proceed as follows:
6.5.4 Remove Signal board Cover
6.5.4.1 For Nio 3 & 5 MP
To remove the Signal board cover:
Nio 2-3-5 MP
1. Start the software tool "Mfdcontrol.exe" (version August 12 2002
at least).
2. In the main menu, select the proper display.
3. In the main menu, click on EDID.
4. Click on Read (EDID PROM) to read the PROM contents.
5. Click on Save and save the file on the hard disk. As file name you
better use the serial no. of the display. The file extension is .dat.
1. Start the software tool Mfdcontrol.exe.
2. In the main menu, select the proper display.
3. Click on Upload.
4. In the Upload window, click on EEPROM to file.
5. The data is saved on the PC as "EExxxxxx", where xxxxxx is the
display serial number.
For Nio 2MP, it is not necessary to store the EDID-PROM content on PC.
The EDID PROM content is stored within the EEPROM. Each time the
display starts up, the EDID PROM content is loaded from the EEPROM.
See Section "First level service".
See Section "First level service".
1. Remove the 2 screws and 2 bolts at the input connectors.
Signal board replacement
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-2320 paE-3420E-5420

Table of Contents