2.1
UNPACKING THE FIRE
Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List
1off
Fire box / burner assembly
1off
Boxed ceramic base, front ceramic rail and fire bed and 19 synthetic
coals (2 small, 13 medium & 4 large)
1off
Loose items bag.
1off
Black or Brass Trim (dependent upon model chosen)
1off
Fret & Ashpan Cover
1off each User instruction book and Installation book
2.2
INSTALLING THE FIRE BOX
Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, insulated pre-fabricated
metal flue box to BS 715 / BS EN 1856-2 or Pre-Cast Flue to B.S. E.N. 1858
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to BS 715 / BS EN 1856-2 and pre-
cast flues the restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
SECTION 2
INSTALLATION OF FIRE
10