Chapter 3 Parallel UPS Installation And Commissioning

3.4 Connecting Power Cables

Each single UPS of the parallel system needs to configure the MCB and cables respectively, refer to 2.5 Connecting
Power Cables for the specification. The recommended configurations of the total power cables are listed in Table 3-1
for the parallel system.
Table 3-1 Input & output cable CSA for the parallel system (unit: mm
Single input
Parallel UPS
number
2 units
3 units
4 units

3.4.1 Connecting I/O Cables

The power cables of the UPS are connected to the I/O terminal block of the rear panel of the UPS, the layout of the
I/O terminal block is shown in Figure 2-13.
Power distribution mode
There are two modes for UPS parallel power distribution: using the 1 + 1 parallel POD (optional) provided by
Emerson, self-distribution.
The I/O cable connections are divided into four types: 3-in 3-out, common source configuration (factory default), 3-in
3-out, split-bypass configuration, 3-in 1-out, common source configuration, 3-in 1-out, split-bypass configuration. The
I/O cable connection procedures of the four self- distribution modes are as follows.
1. Using parallel POD power distribution
It is recommended to use 1 + 1 parallel POD power distribution mode if you need 1 + 1 parallel system, for the
installation and commissioning, refer to Liebert
Manual.
2. Self-distribution for the parallel system
When the UPS number of the parallel system is more than two, use self-distribution mode.
The block diagram of three UPSs parallel system is shown in Figure 3-2. Refer to Power distribution mode in
2.5.1 Connecting I/O cables for the cable connection of each UPS. Refer to 2.5 Connecting Power Cables for the
input and output MCB, the battery MCB and the cables when using the self-distribution mode.
1 + 1 parallel
POD (1 pcs)
UPS (2 pcs)
Figure 3-1 1 + 1 parallel system installation (without battery module)
3-in 3-out
Single output
cable for
cable for
parallel
parallel
system
system
25
25
35
35
50
50
Liebert
ITA 16kVA And 20kVA UPS User Manual
®
Total neutral
Grounding
line for
cable for
parallel
parallel
system
system
35
16
50
16
70
25
ITA 16kVA And 20kVA UPS Power Output Distribution Unit User
®
2
, ambient temperature: 25
3-in 1-out
Total output
Total neutral
cable for
line for
parallel
parallel
system
system
70
120
150
240
240
370
)
Grounding
cable for
parallel
system
35
75
120