Under The Cabinet - KOBE CH3830SQB-1 Installation Instructions And Operation Manual

Brand range hood
Table of Contents

Advertisement

For Ductless Models only:
MODEL NO.:
CH3830SQBD-1 (30") / CH3836SQBD-1 (36")
Preparation before Installation
-
Temporarily wire the hood to test for proper
operation before installing. If the hood
does
not
operate,
breaker or house fuse. If the hood is
still
not
working, disconnect
supply and check the continuity of all
wire connections.
-
Peel protective film off the hood (if any).
-
For installing under the cabinet with
recessed bottom, attach 4-inch wide wood
filler strips (not included) on each side.
(Figure 19)
-
Using reference on Page 25 to measure
and create access opening for electrical
wires and exhaust under the cabinet.
Hood Installation
CAUTION
: If moving the cooking
range is necessary to install the hood, turn
off the power in an electric range at the
main electrical box. SHUT OFF THE GAS
BEFORE MOVING A GAS RANGE. And use
a protective covering to protect cooktop
and/or countertop from damage.
1. Remove the bottom casing or baffle
filters/stainless steel spacers if necessary;
arrange the electrical wires to run through
the 1" diameter hole on the top or the rear
of the hood.
2. Using
references
measurements on page 25, center the
hood in place beneath the cabinet and
flush with the front of the cabinet.
3. Draw electrical wires through cabinet
access opening.
4. Use electrical drill to remove the knockout
holes on top of the range hood.
5. Place screw (not provided) into the exact
center of each knockout hole. Make sure
all screws are in place before tightening
screws.
CAUTION
: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
UNDER CABINET INSTALLATION
check
the
circuit
power
on
Table
1
and
www.goedekers.com
Figure 19
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch3830sqbd-1Ch3836sqbd-1Ch3836sqb-1

Table of Contents