BLADEZ E500 Owner's Manual page 17

Hide thumbs Also See for E500:
Table of Contents

Advertisement

STEP 5
1) Connect the left Side Rail (42L) with the left Lower Handlebar
(33L) using Allen Bolt
(34), Flat Washer (32) and nylon Nut (31).
2) Attach the left Side Rail (42L) onto the left crank and secure it with the Flat Washer (39),
Spring Washer (19) and Allen Bolt (20). Do the same for the right Pedal Bar (42R). Put the 2
crank End Caps (38) onto the left and right crank.
////
//
116
2O
/
/
/
38 39
19
/
42L
I
i
j
i
33L....i
33L...... P
.... 33R
99
39 19 26 3_8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents