Front Installation; Brick Installation - Quadra-Fire TOPAZ 839-1290 Installation And Operation Maintenance Owner's Manual

Direct vent room heater
Hide thumbs Also See for TOPAZ 839-1290:
Table of Contents

Advertisement

E. Front Installation
Fronts shipped attached to face
INSTALLATION
AND REMOVAL INSTRUCTIONS
FOR QUARTET AND SOLITAIRE FACE OPTIONS.
Quartet Front
Solitaire Front
Figure 8.11
For BOTH Quartet and Solitaire Fronts:
To remove the face, loosen the thumb bolt beneath
Figure 8.12
the ashlip.
Figure 8.13
on the bottom. Set aside in a safe location.
Figure 8.14
installation. The spacer is shipped in place and should be
put back if removed.
F. Brick Installation
NOTE: The brick supplied with the Topaz is not an
optional accessory. The brick must be installed for safe
and proper operation.
Figure 8.15
fl ush and centered against the back of the fi rebox.
NOTE: Rear panel and top panel/baffl e are the same size.
Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14
Lift up on the top of the Front, gently pulling out
Spacer
The quartet door requires the use of a spacer for
Install rear panel by placing it behind the log pins,
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topaz 839-1320Topaz-d-csbTopaz 839-1340

Table of Contents