Installation - Fetco CBS-2031ee User Manual

Hide thumbs Also See for CBS-2031ee:
Table of Contents

Advertisement

Keys To A Successful Installation
If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.
Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
Electrical:
All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral
may cause damage to the electronic components.
The electrical diagram is located on the inside of the lower cover.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
Before connecting it to the brewer, verify that the water line pressure is 20 – 75 psig and the flow rate
meets the following minimum requirements:
General:
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
may be found on our web site, http://www.fetco.com.
Installation Instructions
Brewer Setup
1. Review the Dimensions for the unit you are installing. Verify that the brewer will fit in the space intended for it,
and that the counter or table will support the total weight of the brewer and dispensers when filled.
2. The brewer's legs are shipped inside the brew baskets.
Remove the brew basket(s) and the coffee dispenser(s).
Place the brewer on its back and screw in the legs.
3. Place the brewer on the counter or stand.
4. When the brewer is in position, level it front to back as well
as side to side by adjusting the legs.
5. Remove the lower cover to access the water and electrical connections. Knock-outs are provided in the back
and base of the brewer body for the connections.
Water Connection
1. Water inlet is a 3/8 inch male flare fitting.
2. The brewer can be connected to a cold or hot water line. Cold water is preferred for best coffee flavor, but hot
water will allow for faster recovery times.
3. Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should be
installed after the water shut off valve and in a position to facilitate filter replacement.
4. Flush the water supply line and filter before connecting it to the brewer.
5. Verify that the water line meets the pressure and flow requirements listed above.
Electrical Connection – US & Canada
1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer's serial number label. Make sure the electrical service includes neutral.
2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters
during the installation process. The heaters are disabled by the control board until the tank is full of water. The
heating process will start automatically when the tank has filled.
3. The CBS-2031ee and CBS-2041ee models are factory equipped with a 120 V cord and plug. The CBS-
2032ee and 2042ee have only a terminal block for connecting the incoming power wires. Consult local codes to
determine if a cord and plug can be installed, or if the unit must be hard wired.

Installation

(For Qualified Service Technicians Only)
CBS-2031ee: ½ gpm
CBS-2032ee: 1 gpm
CBS-2041ee: 1 gpm
CBS-2042ee: 1 ½ gpm
Warning: Legs are to be adjusted for
leveling the brewer only. Do not use
for height adjustment or extend them
higher than necessary.
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-2032eeCbs-2041eeCbs-2042ee

Table of Contents