Installation; General; Lifting Instructions; Location - ESAB Warrior 500i CC/CV Instruction Manual

Hide thumbs Also See for Warrior 500i CC/CV:
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 1

5 INSTALLATION

5
INSTALLATION
5.1

General

The installation must be carried out by a professional.
5.2

Lifting instructions

WARNING!
Secure the equipment -
particularly if the ground is
uneven or sloping.
5.3

Location

Position the welding power source such its cooling air inlets and outlets are not obstructed.
0463 341 131
- 11 -
© ESAB AB 2013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents