Planning Information - Sub-Zero 500 series Planning And Installation Manual

Hide thumbs Also See for 500 series:
Table of Contents

Advertisement

Planning
Information
Before moving ahead with
any planning you should be
aware of the basic require-
ments for the installation
of a built-in Sub-Zero. The
drawings in Figures 1 and 2
illustrate the finished rough
in dimensions, electrical
and plumbing locations and
minimum door clearance for
all units.
Figure
When using frameless cabinets, you mu.9 add space to the finished rough opening to
(FOOTNOTE:
allow for side mainframe overlap to ensure cabinet and Sub-Zero doors open properly. This space
will fluctuate depending on the installation and overall visual appearance you are trying to achieve.)
When insta//ing cabinets with six inch bases, add two inches to the minimum height
(FOOTNOTE:
detailed above, if you want to make Me base of the Sub-Zero even with the cabinets.)
Locate Electrical
Outlet within Top
Shaded Area
501F Water Supply
within Bottom
Shaded Area
Models
and 5OlR
501F
1
(with leve/ers
6"
Locate Electrical
Outlet within Top
Shaded Area
D
Locate Water Supply
Shaded Area
Models 511, 532,550,
561 and 590
in)
Locate Electrical
Outlet within
Shaded Area
Models 506,601,249R,
Door
2
Figure
23%"
Behind
Frame
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents