Download Print this page

Ketra N3 Installation Manual page 15

Hide thumbs Also See for N3:

Advertisement

Connect Third Party Controls:
Use conduit or NM type cable as appropriate. (Note: acceptable wire is
both solid core and stranded. Gauge range is 16-24 AWG.)
Open appropriate terminals by depressing appropriate terminal buttons.
Make connections to the appropriate ports. (Note: wire strip length is
9-10mm/.35-.39 inches.)
Refer to applicable protocol wiring diagrams.
Verify Successful Installation:
Apply power to circuit.
Green "Power" LED will illuminate indicating successful installation
and product functionality.
Optional: If data is present at any control port, appropriate LED will
indicate status.
Disconnect power and install cover.
Restore power and configure device using Ketra Design Studio
Software.
For software download and updates, visit software.goketra.com.
N3
INSTALLATION INSTRUCTIONS
I N S TA LL ATI O N
770-000014-01-01
PAGE 15

Hide quick links:

Advertisement

loading