Setting The Dmx Base Address; Setting The Master-Slave Link Mode; Checking Gas Pressure; Priming The Machine After Fluid Out - Martin JEM Ready 365 User Manual

Table of Contents

Advertisement

S e t t i n g t h e D M X b a s e a d d r e s s
Use the Previous / Next buttons to select the  option.
Use the Up/Down buttons to set the DMX base address from  to . If
you hold down the button the address will count up or down.
Press the Enter button to store the address setting.
The machine will automatically respond to a DMX controller whenever it is
connected. The Address may also be set via RDM, and requires 3 channels.
When using in a DMX system ensure the LINK menu is set to RECV to avoid
causing DMX errors to other devices on the system.
S e t t i n g t h e m a s t e r - s l a v e l i n k m o d e
It is possible to control several machines from one digital remote. The machine
with the remote plugged into it becomes the Master. The other machines are
Slaves. The machines are interconnected with DMX cabling.
Use the Previous / Next buttons to select the  option.
Use the Up/Down buttons to select  (slave unit) or (master unit).
Press the Enter button to store the link setting.
The machine should be set to  only if it is running as a master. If running
as a slave, stand-alone or DMX controlled it should be set to .
C h e c k i n g g a s p r e s s u r e
Select the  option, then use the Enter button to display the recorded value.
The display will show the gas pressure in PSI which should be about 34 when
running at 100% output (not in silent mode). This information is for diagnostic use
only and has no effect on the operation of the machine, gas pressure control
being fully automatic.
To disable the PSI display, use the menu forward/ back keys or wait for a time-
out of the display to occur.
The machine automatically compensates for changing gas
pressure. You cannot change the haze density by adjusting the gas
cylinder valve. If the gas cylinder runs out, the machine will run for
about 30 minutes before shutting down and the display will show
GAS LOW, followed by GAS OUT.
P r i m i n g t h e m a c h i n e a f t e r f l u i d o u t
If the machine runs out of fluid it should be shut down to prevent damage to the
pump. To suck the new fluid back into the machine, replace/refill the fluid tank
and use the prime function.
Use the Previous / Next buttons to select the  option.
Use the Up/Down buttons to change the option to .
Press the Enter button to start the priming function.
The machine will pump at full power for about 10 seconds or until the unit senses
fluid in the heat exchanger. You may need to repeat this two or three times if the
fluid pipes are completely empty.
To exit this menu if you decide not to activate the Prime function, select  and
press Enter.
Control settings
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents