Main Unit Status; Procedure For Adding A Pci Express Card; Checking The Delivered Items; Mounting The Adding Options - Cisco C880 M4 Service Manual

Hide thumbs Also See for C880 M4:
Table of Contents

Advertisement

SET0901030

9.1.3 Main unit status

- Table 9.1.3 lists whether an SB addition can be added in each main unit status.
Main unit status
- AC power to the main unit is off
(Cold maintenance (AC power off))
- AC power to the main unit is on
- System Powered Off
(Cold maintenance (standby))
- AC power to the main unit is on
- System Powered On
(Hot maintenance)
SET0902000

9.2 Procedure for Adding a PCI Express Card

SET0902010

9.2.1 Checking the delivered items

(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The target functions can be used with the specifications and version level of the units delivered
separately due to delivery considerations.
SET0902020

9.2.2 Mounting the adding options

Use the following steps to mount the added options.
ANNT) Confirm the quantities and installation locations with a system administrator.
ANNT) If you start the work with the main unit powered off, turn on the AC power and mount the added
options.
(1) Install the bracket of the PCI Express card (FH or LP) into the mounting slot according to
Table 9.2.2-1. See Figure 9.2.2.
The bracket and screws are parts of the PCI Express card.
A PCI Express card which does not fit other brackets can only be mounted into the mounting slot
suitable for attached bracket.
Table 9.1.3
Work possible?
Yes
Yes
No
43
CA92344-0577-01