2G4
1-2-2
Unpacking and installation
(1) Installation procedure
Start
Unpacking.
Unlocking the shipping lock.
Installing the toner container.
Loading the paper.
Installing the original table and ejection extension.
Attaching the language sheet label sheets.
Connecting the cables.
Initializing the printer and printing a report page
for test.
Installing the printer software.
Installing the scanner software.
Print a document.
Completion of the machine installation.
Figure 1-2-2
1-2-2