Technical Data - gledhill BoilerMate BP Installation & Service Manual

Mains pressure hot water thermal store for use with gas or oil boilers
Table of Contents

Advertisement

DESIGN
C5
C8
2
C3
C4

TECHNICAL DATA

C6
1
C2
C1
C7
Figure 1
Page 4
Standard Equipment
The standard confi guration of the BoilerMateBP
is shown opposite and it is supplied with the
following factory fi tted equipment: -
1
Thermostatic dhw blending valve – set at 55°C
2
Store thermostat – set at 75°C
3
Feed and expansion cistern complete with
ball valve and fl oat (not shown) – loose, to
be piped by the installer
Factory Fitted Optional Equipment
A1 Electronic scale prevention device
Supply Only Optional Equipment
Immersion heater
Pipe Connections
The position of the pipe connections is shown
opposite and the connection sizes are listed in table 1.
C1 Mains cold water inlet
C2 Hot water outlet
C3 Primary heat exchanger fl ow
C4 Primary heat exchanger return
C5 Open vent
C6 Cold feed
C7 Drain
C8 Immersion heater boss
All the connections are also labelled on the
appliance. It is essential that the pipework is
connected to the correct connection.
Note: The safety open vent and cold feed/
expansion must be connected to the F & E
cistern using the pipework assembly provided.
Do not alter or connect any pressure-relief
device to the vent pipe of this water heater.
All factory made joints should be checked after
installation in case they have been loosened
during transit.
The fi ttings for the feed and expansion cistern
should be installed in a position to suit the
particular location and the cistern fi tted on its
supports/base.
The cold feed/expansion and safety open vent
should be installed between the appliance and
the feed and expansion cistern.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents