Yamaha 2007 FZ6-NA Service Manual page 93

Table of Contents

Advertisement

FZ6-S/FZ6-SHG(W)/FZ6-SA/FZ6-SAHG
1. Left handlebar switch lead
2. Main switch and immobilizer lead
3. Clutch cable
4. Throttle cables
5. Right handlebar switch lead
A. Clamp the right and left handlebar switch
leads and handlebars. Point the tip of the
clamp downward in front of the handlebar.
B. 45–65 mm (1.77–2.56 in)
C. Clamp the horn lead and main switch and
immobilizer lead to the inner tube. Point the
binding section to the outside of the vehicle
body and cut the tip down to the length of 1
to 5 mm (0.04 to 0.20 in).
D. Route the horn lead by the headmost side.
E. 5–25 mm (0.20–0.98 in)
F. Clamp the horn lead to the inner tube.
Point the binding section to the outside of
the vehicle body and cut the tip down to the
length of 1 to 5 mm (0.04 to 0.20 in).
G. Pass the throttle cables, wire harness lead,
clutch cable, main switch and immobilizer
lead and left handlebar switch lead in order
through the frame hole from the lower side
of the vehicle.
H. Point the lead, which comes from the ter-
minal, to the front side of the vehicle body.
There should be no slack of leads between
the band and terminals.
I. Clamp the brake hose to the inner tube.
Point the binding section to the outside of
the vehicle body and cut the tip down to the
length of 1 to 5 mm (0.04 to 0.20 in).
J. Pass the throttle cables through the wire
guide. Route the right handlebar switch
lead by the outside of the wire guide.
2-48
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents