2.3 Installing the device
place on a stable, solid (concrete slab type), level and plane surface,
ensure that it will not be flooded by condensation water produced by the device during operation (see §2.4)
The anti‐vibration blocs are fitted under the base of the heat pump.
The heat pump can be fixed to the ground using the brackets at the base of the unit (attachments not
included). A diagram for drilling is featured on the back of the packing box.
2.4 Hydraulic connections
Check the direction of the pipework connection (see § "Dimensions" in the appendix).
The connection include a Ø 50 PVC rigid pipe, from a by‐pass, on the swimming pool filtration circuit, after the
filter and before any water treatment unit .
check the tightening of the hydraulic connections, and check for leaks,
Hydraulic circuit pressure
test
Z300
bar
M4
M5‐T5‐
MD5‐TD5
3
M7
MD8‐TD8
H0439100.A1.EN – 2013/10
service
bar
1.5
Fixing holes
V1‐V2‐V3: by‐pass valves
V5‐V4: setting valves (optional)
* minimum distance
by‐pass
filter
water treatment unit
electrical protection boxes
Connections
= inlet
= outlet
Ø50
Mean water
Head loss
flowrate
test
m³/h
mCE
4
1.4
5
1.5
6
1.5
6.5
1.1
4