Installing The Device; Hydraulic Connections - Zodiac PF Premium 11T Instructions For Installation And Use Manual

Table of Contents

Advertisement

2.3 Installing the device 
 
 fit the 5 stabilizing blocks (supplied, see §1.2), if they are not already fitted under the device, 
 place on a stable, solid (concrete slab type), level and plane surface,   
 ensure that it will not be flooded by condensation water produced by the device during operation (see §2.4) 
 
 
 
The  heat  pump  can  be  fixed  to  the  ground  using  the  brackets  at  the  base  of  the  unit  (attachments  not 
 
included). A diagram for drilling is featured on the back of the packing box. 
 
2.4 Hydraulic connections 
 
Check the direction of the pipework connection (see § "Dimensions" in the appendix). 
 
 
 The connection include a Ø 50 PVC rigid pipe, from a by‐pass, on the swimming pool filtration circuit, after the 
filter  and before any water treatment unit . 
 check the tightening of the hydraulic connections, and check for leaks, 
 
 
 
Hydraulic circuit pressure 
test  
PFP 
bar 
11 
13 
15 
 
 
 
H03620‐00.D2.EN – 2013/03
 
 
 
service  
bar 
1.5 
 
Fixing holes
 
V1‐V2‐V3: by‐pass valves 
V5‐V4: setting valves (optional) 
* minimum distance 
 by‐pass  
 filter  
 water treatment unit  
 electrical protection boxes 
Connections 
= inlet   
 = outlet 
Ø50  
 
 
Mean water 
Head loss 
flowrate 
test  
m³/h 
mCE 
1.3 
1.4 
1.5 
1.5 
6.5 
1.1 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf premium 8mPf premium 11mPf premium 6mPf premium 13mPf premium tsr-11tPf premium tsr-15m ... Show all

Table of Contents