3. Installation Preparation.

To prevent personal injury and damage, ensure that
the hanging location allows the blades a clearance of
7ft. (2.13m) from the floor and 30in. (76cm) from any
wall or obstruction.
This fan is suitable for room sizes up to 400 square
feet (37.2 square meters).
This fan can be mounted with a downrod
on a regular (no-slope) or vaulted ceiling. The
hanging length can be extended by purchasing a
longer downrod (0.5in./1.27cm diameter). After
installing hanging bracket, continue to Section 5 on
page 4 for those instructions. This fan can also be
mounted with flushmount installation only on a
regular (no-slope) ceiling. After installing hanging
bracket, continue to Section 6 on page 5 for those
instructions.
Installation requires these tools:
Phillips screwdriver, flat-head screwdriver,
adjustable pliers or wrench, stepladder, wire cutters,
and rated electrical tape.

4. Hanging Bracket Installation.

Turn off circuit breakers to current fixture from breaker
panel and be sure operating light switch is turned to the
OFF position.
WARNING: Failure to disconnect power supply prior to
installation may result in serious injury.
Remove existing fixture.
WARNING: When using an existing outlet box, be sure the
outlet box is securely attached to the building structure and
can support the full weight of the fan. Ensure the outlet box is
clearly marked "Suitable for Fan Support." If not, it must be
replaced with an approved outlet box. Failure to do so can
result in serious injury.
CAUTION: Be sure outlet box is grounded properly and that a
ground wire (GREEN or bare) is present.
Partially loosen screws in slotted holes of canopy. Remove
the other 2 screws (along with the star washers)--save for
later use. Twist canopy to remove hanging bracket.
Install hanging bracket to outlet box using original screws,
spring washers and flat washers provided with new or
original outlet box.* If installing on a vaulted ceiling, face
opening of hanging bracket towards high point of ceiling.
Arrange electrical wiring around the back of the hanging
bracket and away from the bracket opening.
*Note: It is very important that you use the proper hardware
when installing the hanging bracket as this will support the fan.
blade edge
30
inches
7 feet
(76cm)
(2.13m)
downrod
installation
hanging bracket
flat washers
spring washers
outlet box screws
page 3
12ft. - 20ft.
(3.66m - 6.1m)
flushmount
installation
Vaulted ceiling
angle is not to
exceed 25 degrees.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-gd52an5c

Table of Contents