dual Gate Operators

The gates must be properly installed and work freely in both directions prior to the installation of the dual gate operators.
See "Gate Operator Position" on page 6 for operator positions.
Secure EACH gate
operator to concrete
pad with four (4)
1/2" x 3" (min)
sleeve anchors.
1/2
Secondary
6" Above
Ground
Check local building codes in your area for
Input
depth of concrete before installation.
Power
Concrete Depth Note: The heavier the gates, the deeper the concrete
pads should be. At least two feet recommended for heavier gates.
Each entrapment protection device MUST be connected to corresponding gate operator.
Illustrations not to scale
Secondary
ON
MAX PS-24
AC
POWER
Made in USA
POWER SUPPLY
OFF
IN
FUSE
7 AMP
MC-100
Motor Controller
ERD
JOG
JOG
Matrix
UL
Sensitivity
LEFT
RIGHT
On Line
Edge 1
Entrap
MOTOR OVERLOAD
ERD
Power
Min
Max
INPUTS
Limit SW
On Line
Edge 2
Photo
Cell
Photocell
(OPENING Cycle
ONLY)
installation
Conduit Guidelines and Suggestions
REQUIRED - Run AC input power wire to EACH gate operator.
REQUIRED - Run 24VDC/RS-485/(Jog switch optional) wires from PRIMARY operator to the CONTROL BOX.
REQUIRED - Run RS-485/(Jog switch optional) wires from SECONDARY operator to the CONTROL BOX.
Run UL 325 entrapment protection device conduits to EACH Corresponding GATE OPERATOR. (see below & page 14)
Run the CLOSING cycle protection device conduit (photocells) to the CONTROL BOX. (page 14)
Run in-ground loop wires to the CONTROL BOX. (page 15)
Arms MUST be installed level.
RS-485/Jog Switch to Control Box
Outside Property
to Secondary Operator
Inside Property
Support Bars: See bottom of page 8.
19"
"Optional" Input Power Note:
24VDC low voltage power wires can be run from a remote
power supply (MAX Magic Boxes) to power the gate
operators if desired. See page 11 for more information.
Sensing Edges
to Primary Operator
Illustration not to scale
Control Box
Primary
24VDC/RS-485/
Jog Switch
Conduit
Input
Power
Primary
ON
MAX PS-24
AC
POWER
Made in USA
POWER SUPPLY
OFF
IN
FUSE
7 AMP
MC-100
Motor Controller
ERD
JOG
JOG
Matrix
UL
Sensitivity
LEFT
RIGHT
On Line
Edge 1
Entrap
MOTOR OVERLOAD
ERD
Power
Min
Max
INPUTS
On Line
Limit SW
Edge 2
Photo
Cell
Photocell
(OPENING Cycle
ONLY)
9