Single Gate Operator - Max Phantom 2000 Installation And Owner's Manual

High traffic commercial brushless dc low profile swing gate operator
Table of Contents

Advertisement

single Gate Operator

The gate must be properly installed and work freely in both directions prior to the installation of the gate operator.
See "Gate Operator Position" on page 6 for operator position.
Conduit Guidelines and Suggestions
Support Bar: See below
Ground Level
"Optional" Input Power Note:
24VDC low voltage power wires can be run
from a remote power supply (MAX Magic
Box) to power the gate operator if desired.
See page 11 for more information.
Support Bar
A support bar should be installed at the gate bracket height across the ENTIRE gate to keep the gate pickets from bending.
Support Bar
Support Bar Too High & Not Long Enough
8
installation
REQUIRED - AC input power wire to the GATE OPERATOR.
REQUIRED - 24VDC/RS-485/(Jog switch optional) wires from CONTROL BOX to GATE OPERATOR.
OPENING cycle protection device wires (photocells) to the GATE OPERATOR. See page 14.
CLOSING cycle protection device wires (photocells) to the CONTROL BOX. See page 14.
In-ground loop wires to the CONTROL BOX. See page 15.
YES
YES
NO
NO
(See page 7)
Arm MUST be installed level.
19"
Check local building
codes in your area for
depth of concrete
before installation.
Concrete Depth Note: The heavier the gate, the deeper the concrete
pad should be. At least two feet recommended for heavier gate.
Gate Bracket
19"
Illustration not to scale
Control Box
Secure gate operator
to concrete pad with
four (4) 1/2" x 3"
(min) sleeve anchors.
1/2
6" Above Ground
24VDC/RS-485/
Jog Switch
Conduit
Input Power
Concrete Pad