5.4
ASSEMBLING THE CERAMICS AND FUEL BED
5.4.1
Place the fuel-bed front ceramic fibre as shown below in figure 1.
Fig. 1
5.4.2
Place the left hand and right hand front ceramic fibre pieces as shown
below in figure 2.
Fig. 2
Front ceramic fibre
Left and right hand front ceramic fibres
36