FLIR Navigator II Installation Manual page 14

For static and pan/tilt configurations
Hide thumbs Also See for Navigator II:
Table of Contents

Advertisement

Step 6 When finished, all 5 terminations should look like this (female termination
shown).
Note that the un-insulated signal drain is also terminated.
Step 7 Insert the male terminations in the grey shrouds and the female
terminations in the black towers. Push them in until you hear them click
into place. (More detailed Weather Pack termination instructions are
available on their website,
http://www.weatherpack.com/weatherpackfaqs.html.)
CAUTION!!!
The shroud and tower are keyed to ensure one-way connection.
Take care to make sure that the wires on each end match the other, or you
will damage the Navigator II!
Step 8 When you are sure that the wires will mate correctly, snap the tower
and shroud together. Check for proper signal continuity before you apply
power to the system.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents