Installation; Work Surface Installation - Lincat EB3 Installation, User & Servicing Instructions

Automatic fill water boilers
Table of Contents

Advertisement

IS09 ECN2087

Installation

Qualified personnel must carry out all installation work.

Work Surface Installation

The work surface onto which the appliance is to be sited must have the relevant physical
properties to sustain the working weight of the relevant appliance.
Working Weights
EB3
EB4
EB6
EB6T
If water, electrical and drainage services are to be brought through the work surface ensure there
is sufficient cable slack, movement for the flexible inlet hose and drain tubing (optional) to allow
for free access maintenance and service personnel.
Where electrical sockets or electrical isolation points are fixed below the work surface then these
points must not be able to come into contact with water. Access to electrical isolating points must
not be obstructed in case of emergency. Instruction to the owner of the appliance must be given
on how to isolate the appliance in case of emergency.
The work surface must have a minimum depth of 600mm.
EB4 dimensional details
The spillage tray must be fitted with the appliance
30.5kg
34.5kg
46kg
46kg
EB6 dimensional details
EB3 dimensional details
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EB3 and is the answer not in the manual?

Questions and answers

Mike ward
February 10, 2025

What descaling compound should I use for Lincat Boiler

1 comments:
Mr. Anderson
February 11, 2025

The Lincat EB3 boiler is supplied with a pack of de-scaling compound. Only parts recommended by the manufacturer should be used for maintenance, including descaling.

This answer is automatically generated

How to reset timer
April 22, 2025

LINCAT water boiler EB3FX How to reset timer

Subscribe to Our Youtube Channel

This manual is also suitable for:

Eb6Eb4Eb6t

Table of Contents

Save PDF