Introduction; Warnings; Site Preparation - Brocade Communications Systems Mobility 650 Installation Manual

Access point
Table of Contents

Advertisement

Introduction

The Brocade Mobility 650 Access Point links wireless 802.11a/b/g/n devices to the
controller, enabling growth of your wireless network with a cost-effective alternative
to standard access points. The Brocade Mobility 650 provides two placement
options: wall and ceiling. Wall mount slots fit onto two screws provided. Arrows on
the case guide placement of the screws. For placement above a suspended ceiling,
a safety wire tie point on the case provides for a loop of safety wire. The light pipe
fits through a hole in the ceiling tile to provide a view of the unit's status lights.
The Brocade Mobility 650 receives all power and transfers data through the same
CAT-5 or better Ethernet cable. There is no additional power supply required. An
802.3af Ethernet switch or power injector is required.

Warnings

Read all installation instructions and site survey reports, and verify correct
equipment installation before connecting the Brocade Mobility 650 Access
Point.
Remove jewelry and watches before installing this equipment.
Verify that the unit is grounded before connecting it to the power source.
Verify that any device connected to this unit is properly wired and grounded.
Verify there is adequate ventilation around the device, and that ambient
temperatures meet equipment operation specifications.

Site preparation

Consult your site survey and network analysis reports to determine specific
equipment placement, power drops, and so on.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Ensure adequate, dust-free ventilation to all installed equipment.
Brocade Mobility 650 Access Point Installation Guide
53-1001934-02
Chapter
1
1

Advertisement

Table of Contents
loading

Table of Contents