12
C
2: I
HAPTER
NSTALLING THE
Unpacking
V7122 M
G
EDIA
ATEWAYS
Table 2 V7122 Front View Component Descriptions (continued)
Item Label
7
ETH
8
--
9
--
10
--
11
--
The following main sequential steps need to be performed for installing
the V7122:
1 Unpack the V7122 (see Unpacking).
2 Check the package contents (see
3 Mount the V7122 (see
4 Cable the V7122 (see
After powering-up the V7122, the Ready and LAN LEDs on the front
panel turn to green (after a self-testing period of about three minutes).
Any malfunction changes the Ready LED to red (see
V7122 Chassis LEDs
Once you have completed these hardware installation steps, you can
begin configuring the gateway (see
Gateways).
Follow the procedure below for unpacking the box in which the V7122 is
delivered.
To unpack the V7122, perform these steps:
1 Open the carton and remove packing materials.
2 Remove the V7122 unit from the carton.
3 Check that there is no equipment damage.
4 Check, retain and process any documents.
5 Notify 3Com or your local supplier of any damage or discrepancies.
Component Description
Ethernet LED indicators
Reset button
cPCI LED indicators
Power and Fan LEDs
An available cPCI slot for an optional third-party CPU board
Package
Mounting the
V7122).
Cabling the
V7122).
for details on the V7122 LEDs).
Configuring the V7122 Media
Contents).
Monitoring the
Need help?
Do you have a question about the VCX V7122 and is the answer not in the manual?
Questions and answers