Installation Of Room/Control Panel - ABB Controlpanel Operating Instructions Manual

6136/100c-102-500 cpc/u 3.1
Table of Contents

Advertisement

Available languages

Available languages

8.2

Installation of room/control panel

This unit may only be installed in flush-mounting box 6136/UP or MD/U 1.1.
1. Fit terminals to the lines (230V, TP if
required) (see chapter "Connection").
2. Connect terminals to the unit.
3. Insert unit into flush-mounting box and
tighten screws (Fig. 64).
4. Attach the frame and secure it using the
enclosed screw (Fig. 65).
ENG
Fig. 64
Fig. 65
41

Advertisement

Chapters

Table of Contents
loading

Table of Contents