Installing Take Up Reel - Gfp 563TH Operating Manual

Hide thumbs Also See for 563TH:
Table of Contents

Advertisement

11. Installing Take up reel

1. Loosen the pressure-adjusting nut near the right cabinet, and the rewind tube
can then be removed from the machine
2. Slide a paper tube onto the rewind tube by rotating away from the core stop clip
3. Install the rewind tube onto the positioning sleeves with the core stop clip
pointing away from the Nip Rollers or toward rear of the machine with core stop
clip positioned on top of the rewind tube.
of the core stop clip, or the application will be affected.)
4. The rewind tube is driven by friction. The friction and tension will be increased
with a left turn of the pressure-adjusting nut, and a right turn will decrease them.
ote:
Adjust the rewind tube pressure-adjustment nut to allow the
backing paper to be removed and the film to enter the rollers evenly
1. Paper tube 2. Core Stop clip 3. Rewind Tube 4. Left side cabinet
5. Positioning sleeve 6. Positioning sleeve 7. Pressure-adjusting nut 8. Right side cabinet
Gfp 563TH
(Note: Pay attention to the direction
17
December 2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents