3. Align the alignment mark b on the throt-
tle cam 1 with the alignment mark c on
the shift bracket.
4. Adjust the position of the throttle cable
joint until its hole is aligned with the set
pin d on the throttle cam.
CAUTION:
The throttle cable joint must be screwed
in a minimum of 8.0 mm (0.31 in) e.
5. Connect the cable joint, install the clip,
and then tighten the locknut.
6. Check the throttle cable for smooth oper-
ation and adjust the cable length, if nec-
essary, repeating steps 2–6.
Checking the gearshift operation
1. Check
that
the
smoothly when shifting from neutral into
forward and reverse. Adjust the shift
cable length if necessary.
2. Set the gearshift to the neutral position.
3. Loosen the locknut 1, remove the clip
2, and then disconnect the shift cable
joint 3.
62Y3A11
S62Y3400
gearshift
operates
Power unit / Control system
4. Align the set pin a in the center of the
shift bracket with the alignment mark b
on the bracket.
5. Adjust the position of the shift cable joint
until its hole is aligned with the set pin.
CAUTION:
The shift cable joint must be screwed in a
minimum of 8.0 mm (0.31 in) c.
6. Connect the cable joint, install the clip,
and then tighten the locknut.
7. Check the gearshift for smooth operation
and adjust the shift cable length, if nec-
essary, repeating steps 3–6.
1
2
3
4
5
6
S62Y3360
7
8
I
3-14