Attach pulley on Base Frame(1) near weight stack as shown Fig 1 with ball end of cable toward
weight stack. Route cable up to low pulley of Adjustable Pulley Block(25)(Fig 2), then down to
pulley on Base Frame(1)(Fig 3), up to right side pulley in Top Frame(5)(Fig 4) and thread into
the Single Pulley Block(27)(Fig 5).
C ABL E AR M C ONNE C T I NG C ABL E
FIG 4
FIG 3
FIG 1
FIG 5
79
27
11
FIG 1
79
1
91
FIG 2
FIG 2
FIG 5
25
91
FIG 3
61
91
1
FIG 4
5
107
61
79
61
107
107
61
79
79
107
89
61