Order Of Installation - ADS-tec MCR5000 User Manual

Hide thumbs Also See for MCR5000:
Table of Contents

Advertisement

Industrial PCs MCR5000
3.2 O
RDER OF INSTALLATION
The following must be checked before starting the installation:
Check the bearing capacity of the wall
Monitor is permitted for fixing with M6 screws by VESA 100/200
Monitor weight ≤ 50kg
Monitor size ≤ 50"
Installation incline ≤ 30° from vertical line
(0° with DVD operation!)
Observe the monitor data sheet!
Note:
The maximum torque for fixing the MCR 5000 installation screws is 5 Nm for wall-
mount installation. Tighten screws evenly.
© ads-tec GmbH • Heinrich-Hertz-Str. 1 • D-72622 Nürtingen
13

Advertisement

Table of Contents
loading

Table of Contents