Order Of Installation - ADS-tec mcr5000 User Manual

Industrial pc
Hide thumbs Also See for mcr5000:
Table of Contents

Advertisement

Industrial PCs MCR5000
3.2 O
RDER OF INSTALLATIO
The following must
Note:
The maximum torq
installation. Tighten
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-E
ON
be checked before starting the installation:
Check the b
bearing capacity of the wall
Monitor is p
ermitted for fixing with M6 screws by VESA 100/2
Monitor wei
ght ≤ 50kg
Monitor size
e ≤ 50"
Installation
incline ≤ 30° from vertical line
(0° with DV
D operation!)
Observe the
e monitor data sheet!
que for fixing the MCR 5000 installation screws i
en screws evenly.
Echterdingen
200
is 5 Nm for wall-mount
13

Advertisement

Table of Contents
loading

Table of Contents