Before You Start; Items Required For Installation; Cold Climate Insulation; Fireplace Framing - Vermont Castings BLDV300N SC7SB Installation And Operating Instructions Manual

Bldv7 series direct vent gas fireplace
Table of Contents

Advertisement

PRE-INSTALLATION INFORMATION

BEFORE YOU START

Read this homeowner manual thoroughly and follow all
instructions carefully. Inspect all contents for shipping
damage and immediately inform your dealer if any damage
is found. Do not install any unit with damaged, incomplete,
or substitute parts. Check your packing list to verify that
all listed parts have been received. You should have the
following:
Fireplace (Firebox and Burner System)
Rock Wool
Log Set

ITEMS REQUIRED FOR INSTALLATION

Phillips Screwdriver
Hammer
Saw and/or saber saw
Electric Drill and Bits
Pliers
Square
Caulking Material (Noncombustible)
Fireplace Surround Material (Noncombustible)
Piping Complying with Local Codes
Pipe Sealant Approved for use with Propane/LPG
(Resistant to Sulfur Compounds)
WARNING
Do not fill spaces around firebox with insulation or other
materials. This could cause a fire.

COLD CLIMATE INSULATION

If you live in a cold climate, seal all cracks around
your appliance, and wherever cold air could enter the
room, with noncombustible material. It is especially
important to insulate the outside chase cavity
between the studs and under the floor on which the
appliance rests, if the floor is above ground level.
NOTE: Refer to cold climate pilot information on Page 40
for more information on standing pilot vs. intermittent pilot
options.
20306741
Framing Materials
Wall Finishing Materials
Level
Tee Joint
Measuring Tape
Pipe Wrench
BLDV7 Series Gas Fireplace
FIREBOX FRAMING
Firebox framing can be built before or after the appliance
is set in place. Construct firebox framing following Figure 2
for your specific installation requirements. Refer to Figure
2 for firebox dimensions. The framing headers may rest
on the top of the firebox standoffs. Do not bring headers
below top of standoffs. NOTE: When planning your framing
and installation, keep in mind that your gas line will come
in on the right side of the box (as you are facing it) and
your electricity will come in on the left side.
The firebox may be installed directly on a combustible floor
or raised on a platform of an appropriate height. When
the firebox is installed directly on carpeting, tile, or other
combustible material, other than wood flooring, the firebox
shall be installed on a metal or wood panel extending the
full width and depth of the enclosure.
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents