Ball Valve Installation And Operation - McQuay MDS 30 Installation Manual

Mds 30 – 70a(r), mds 80 – 320b(r), 5mds 50 – 500b(r), digital variable multi air conditioner
Table of Contents

Advertisement

The proper steps to insulate the refrigerant piping are shown below.
Thickness
Heat resistance

6.5 Ball valve installation and operation

Operate the gas side ball valve
o
Uninstall the flange connector: remove the flange connector from the piping
o
Stick the seal material to cover the inlet of the ball valve flange to avoid the dirt entry
o
Change the hollow seal pad
o
Fix the flange connector and hollow seal pad and fixed ball valve of gas side with screw bolt.
Liquid side ball valve connecting: expand the copper tube outlet and connect the ball valve connector
Vacuum and charge in refrigerant, ensure to open the valve completely
Calculate the additional refrigerant and charge into units accordingly
Check the looseness to avoid leakage of refrigerant
E
A
o
s
B
C
D
ball valve
(gas side)
J
Copper tube expanded connector dimension.
External Diameter
mm
Ф6.35
Ф9.52
Ф12.7
Ф15.88
Ф19.05
Installation Manual IM-MDS_(i)
Diameter 6.35 - 25.4mm
Min 10mm
E
F
o
s
G
A Valve stem
B Stopper pin
C Packing(accessory)
D Connecting pipe(accessory)
E Open
I
H
F Cap, copper packing
G Service port
ball valve
H Flare nut
(liquid side)
I Liquid pipe diameter
J Gas pipe diameter
K
K Field piping
Diameter
inch
1/4"
9.0
3/8"
13.0
1/2"
16.2
5/8"
19.4
3/4"
23.3
Pipe Specification
Diameter 28.58 - 41.3mm
Min100℃
o
(unit: mm)
Min 12mm
s
Close-packed
packing
Hollow
packing
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents