Thermostat; Furnace Section Controls And Ignition System; Normal Furnace Operating Sequence; Single Stage Gas Valve - McQuay Maverick I MPS006AG Series Installation And Maintenance Manual

Commercial packaged rooftop system cooling only or cooling & heating; gas/electric
Table of Contents

Advertisement

Figure 17: Through Base Electrical Connection
14
CONDUIT SIZE
1/2
7/8
HOLE SIZE
NOTES:
1. DETERMINE REQUIRED WIRE SIZE FROM MINIMUM CIRCUIT AMPACITY SHOWN IN INSTALLATION & OPERATING INSTRUCTION.
2. BOTTOM POWER ENTRY WILL NOT ACCOMMODATE WIRE LARGER THAN #2 AWG (SHADED AREA).

Thermostat

The room thermostat must be compatible with the spark
ignition control on the unit. Generally, all thermostats that are
not of the "current robbing" type are compatible with the
integrated furnace control. The low voltage wiring should be
sized as shown in Table 6.
Table 6
FIELD WIRE SIZE FOR 24 VOLT THERMOSTAT CIRCUITS
SOLID COPPER WIRE - AWG.
3.0
16
14
2.5
16
14
2.0
18
16
50
100
Length of Run – Feet (1)
(1) The total wire length is the distance from the furnace to the
thermostat and back to the furnace.
NOTE: DO NOT USE CONTROL WIRING SMALLER THAN NO. 18
AWG.
Install the room thermostat in accordance with the instruction
sheet packed in the box with the thermostat.
IM 861
12
10
8
1/2
1/2
3/4
7/8
7/8
1-31/32
1-23/64
12
10
10
12
12
12
14
12
12
150
200
250
Figure 18: Typical Thermostat Wiring
I658
WIRE SIZE, AWG
6
4
3
1
1
1-1/4
1-1/4
1-23/64
1-23/32
1-23/32
Furnace Section Controls and
Ignition System

Normal Furnace Operating Sequence

Single Stage Gas Valve

This unit is equipped with an integrated direct spark ignition
control.
1 The thermostat calls for heat.
2 The control board will run a self check to verify that the limit
10
control and manual reset overtemperature control are closed
10
and that the pressure switch is open.
10
3 Upon closure of the pressure switch, the control board
300
energizes the induced draft blower for a 15 second prepurge.
4 After the 15 second prepurge, the gas valve opens and the
spark is initiated for 7 second trial for ignition.
5 Burners ignite and flame sensor proves all burners have lit.
6 The circulating air blower is energized after 30 seconds.
7 The control board enters a normal operation loop in which all
safety controls are monitored continuously.
2
1
0
1-1/2
1-1/2
1-31/32
1-31/32
2-15/32
00
000
2
2
2-15/32
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents