Require annul system inspection of the heating boiler, burner
and controls by qualified service personnel,
Heating system check for safety control functions, system
pressure, leaks, combustion and ventilation air should be done
on a monthly schedule.
Extended Shutdown Periods
If the system is to be shutdown for any extended period of time, please follow these steps:
1. Shut off all pumps
2. Cap off venting of boiler at the boiler collars
3. Shut off supply & Return Valves
4. Shut off the fuel supply valves
5. Disconnect power at the panel
6. Clean boiler and venting