Checking And Maintenance; General Instructions; Periodic Checks - DeDietrich Innovens MCA 25 BIC User Manual

Wall-hung gas condensing boilers
Table of Contents

Advertisement

MCA 25/28 BIC
5

Checking and maintenance

5.1

General instructions

0
2
4
6
8
10
12
E
1
TEMP. : 68°
2
1
D
2
PCU COM.FAIL D27
bar
#
F
!

% $
AUTO
J
I
STD
5.2

Periodic checks

15/06/12 - 300022162-001-01
14
16
18
20
22
24
SUNDAY 11:45
:
<
C002302-D-04
The boiler does not require a lot of maintenance. Nevertheless, we
recommend having the boiler inspected and serviced at regular
intervals.
4 Maintenance and cleaning of the boiler must be carried out at least
once a year by a qualified technician.
4 Have the flues swept at least once a year or more, depending on
the regulations in force in your country.
CAUTION
Maintenance operations must be done by a qualified
4
engineer.
We recommend taking out a maintenance contract.
4
Only original spare parts must be used.
4
Make certain that the flues and chimneys are
4
connected, in good condition and not blocked.
Do not modify nor block the condensate outlet(s).
4
If a neutralisation system is installed, follow the
4
instructions delivered with the neutralisation system
for cleaning and servicing of this system.
The boiler displays a message whenever maintenance is necessary.
1. When the message, REVISION, is displayed, press ? to display
the installer's telephone number (only if the installer has input this
parameter).
2. Contact the fitter.
3. To carry out inspections and maintenance required by a qualified
professional.
4 Check the water pressure in the installation.
If the water pressure is lower than 0,8 bar, more water
should be added. If necessary, top up the water level in the
heating system (recommended hydraulic pressure
between 1,5 and 2,0 bar).
¼ See chapter: "Filling the system", page 27.
5. Checking and maintenance
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innovens mca 28 bic

Table of Contents