Installer Programmable Lighting; Controlling Outputs By Time Schedule; Scheduled Arming - GE Concord Ultra User Instructions

Hide thumbs Also See for Concord Ultra:
Table of Contents

Advertisement

Controlling
Outputs by
Time Schedule
Scheduled
Arming
Note
The panel cannot be dis-
armed by schedules.
24
B
5. Press
to assign another light to a sensor or press
menus.
¾
To detach lights from sensors:
1. At an alphanumeric or fixed display touchpad, enter the programming menus by pressing
System or Partition Master
B
2. Press
until the touchpad displays "ATTACH LIGHTS TO SENSORS" or "LITE TO SN"
#
then press
.
3. The touchpad displays "LIGHT n TO Sn x" or "LT n SN x," (where n is the light number and
x is the sensor number).
A
B
4. Press
or
until the light number (1–9) you would like to deactivate appears.
5. Enter the sensor number as 0 (no sensor) and press #.
*
00
#
6. Press
+
+
to exit the programming menus.

Installer Programmable Lighting

If you would like specific lights to turn on during Entry and Exit Delay times, or if you would
like a light to flash to indicate successful arming and disarming, contact your installer.
Outputs may be used to control devices in your home such as automatic window blinds. Outputs
that your installer has enabled, can be turned on or off according to time schedules. If you need
assistance setting up a time schedule that fits your needs, see "Creating Time Schedules".
¾
To schedule outputs:
1. At an alphanumeric or fixed display touchpad, enter the programming menus by pressing
System or Partition Master
065
#
2. Press
+
3. The touchpad displays "OUTPUTS." Press
B
4. Press
until the touchpad displays the output number you would like to schedule. Refer to
"Appendix A: User Sheets" to determine which output is associated with which output num-
ber.
#
5. Press
. The touchpad displays the first available time schedule.
6. Enter
Š
2
#
+
to assign the time schedule ("ON") for this output.
Š
1
#
+
to make the time schedule inactive for this output.
B
7. Press
to go to the next time schedule, if needed, and turn the schedule on or off for this out-
put.
8. When you've finished attaching the desired time schedules, press
gramming menus.
The Scheduled Arming feature allows the panel to be armed to Level 3—AWAY according to a
schedule. When an active schedule start time is reached the panel will exit User Programming,
automatically bypass any open sensors, and arm to Level 3—AWAY.
The panel will not arm according to an active schedule if the start time is reached while:
The panel is already armed to Level 3—AWAY.
The panel is performing a phone or sensor test.
¾
To schedule arming:
1. At an alphanumeric or fixed display touchpad, enter the programming menus by pressing
System or Partition Master
0660
#.
2. Press
+
3. The touchpad displays "AWAY."
#
4. Press
. The touchpad displays the first available time schedule as "SCHEDULE 00 OFF," or
"SCH 00 OFF."
5. Enter
*
+
CODE
.
CODE
.
#
.
CODE
.
00
#
+
to exit the programming
*
00
#
+
+
to exit the pro-
Concord Ultra
9
+
9
+
9
+

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Concord Ultra and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF