Maintenance Schedule; Fuel Tube; Throttle Operation - Eton America Beamer PN2 Service Manual

Beamer series scooters
Table of Contents

Advertisement

2.2 MAINTENANCE SCHEDULE

The maintenance intervals in the follow table are based upon average riding conditions. Riding in
unusually dusty areas may require more frequent servicing. E-TON recommends that all maintenance
and inspections be performed ONLY by a qualified and fully trained technician.
Fuel Line

Throttle Operation

Air Filter system &
Element
Spark Plug
Carburetor Idle Speed
Brake Shoe Wear
Brake System
Nut, Bolt, Fastener
Wheels & Wheel Nuts
Steering System
Suspension System
C.V.T. Air Filter
Air Induction Reed Valve
Transmission Gear Oil
Note –
I: Inspect and Clean, Adjust, Lubricate, or Replace (if necessary)
C: Clean
L: Lubricate
R: Replace

2.3 FUEL TUBE

Inspect the fuel lines for deterioration, damage, or
leaks, and replace if necessary.
2.4 THROTTLE OPERATION
Inspect for smooth throttle lever full opening and
automatic full closing in all steering positions.
Inspect for deterioration, damage, or kinking
in the throttle cable. Replace if necessary.
Check the throttle lever. Free play is 5-10 mm at the tip
of the throttle lever.
Disconnect the throttle cable at the upper end.
Lubricate the cable with commercially available lubricant to prevent premature wear.
Beamer Rev-2.0.2
INITIAL
REGULAR SERVICE
SERVICE
(First week)
(Every 30 operating
I
I
I
I
I
I
I
Page 9 of 55
EVERY
YEAR
days)
I
I
I
C
R
I
R
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C
R
I
C/R
I
R
9/21/2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Beamer ii pn2bBeamer matrix pn2c

Table of Contents