I-Series Ice Machine Training Manual
6. Reassemble, making sure the new thermistor is in the proper location. Replace the
insulation around the thermistor or the ice machine will not function properly.
6. C
ONTROLS AND
6.1 Controls Board Features (Red and Yellow Boards)
• 4 second power-up sequence, adjusts board to correct voltage and Hertz before
the compressor starts
• Push button test mode
• 8 inline power connectors
• Bridge adjustment range indicator
• Dip switch selectors for curtain switches 1-4
• Dip switch selector for dump cycles
• Circuit board will retrofit for service replacements
- 16 -
E
LECTRICAL
© 2001, IMI Cornelius Inc.