ELECTRICAL
1. All wiring and connections must conform to national and local electrical codes.
2. Wire size and circuit protection must conform to specifications and cuber must be on a separate electrical
circuit.
3. Strain relief connectors must be used at the junctions box of the control box and the cuber.
4. Cuber must be grounded by the control box ground screw or other method for intentional safety grounding
that meets code requirements.
5. A manual disconnect in a convenient location to the cuber must be installed.
INSTALLATION CHECK POINTS
1. Has bin and cuber been leveled and sanitized?
2. Does electrical and plumbing meet code requirements?
3. Check correct operating water level in the water pan.
4. If water-cooled, are inlet and drain connections to condenser correct to prevent "water hammer"?
5. Are drain lines separate and vented?
6. Is there 6I clearance on all sides and top for proper air circulation?
7.
Does the water curtain move freely, and does the float valve shut off incoming water to the water pan?
1-3/4I
Î Î Î Î
3/8I
Î Î Î Î
Î Î Î Î
Î Î Î Î
Î Î Î Î
WATER PAN
RIGHT SIDE VIEW
xiii
OPERATING WATER LEVEL 2448
FOUR EVAPORATOR UNIT
OPERATING WATER LEVEL
SINGLE EVAPORATOR UNITS
OPERATING WATER LEVEL
DUAL EVAPORATOR UNITS
166240001