Flaker/Nugget Modular Head Ice Maker Remote Cooled Part No. 630460004 3/31/97 Revised 4/11/97 THIS DOCUMENT CONTAINS IMPORTANT INFORMATION This Manual must be read and understood before installing or operating this equipment IMI CORNELIUS INC; January 1997 PRINTED IN U.S.A...
If you encounter a problem which is not covered in this manual, please feel free to write or call. We will be happy to assist you in any way we can. When writing, please state the model and serial number of the machine. Address all correspondence to: A Product of IMI Cornelius Inc. One Cornelius Place Anoka, MN 55303–1592 Phone 800–554–3526 FAX 612–422–3232...
INSTALLATION INSTRUCTIONS You will get better service from the ice machine, longer life and greater convenience if you choose its location with care. Select a location as close as possible to where the highest volume of ice will used. Here are a few points to consider: 1.
10. The incoming water for the ice making section requires a 3/8” copper tube. Connect this water tube to the 3/8” male flare fitting on the back of the unit. Make all drain connections. Drain tubes cannot be teed together. See Figure 2 for location of all plumbing connections. NOTE: For water cooled units, a separate 3/8”...
WATER AND ICE CIRCUIT The supply water enters the float chamber through a small orifice. The water level rises and lifts the float arm on the float valve and seats the valve, shutting off the water supply when the water is at the desired level. As the water leaves the float chamber, filling the evaporator, the float drops and allows additional water to enter refilling the float chamber.
“I” SERIES FLAKER CLEANING AND SANITIZING PROCEDURE 1. To eliminate water from entering the reservoir, block up the float located inside the reservoir, activate the dump switch to the “ON” position and turn the power switch to “ON”. Allow the evaporator to drain. Turn the power switch to the “OFF”...
IMI Cornelius has water filter/treatment systems available to control impurities found in most water supplies. Contact your local dealer for more information.
CONTROL START HIGH CAPACITOR CAPACITOR PRESSURE 35MFD 370V 145-174MFD 250V COMPRESSOR C.O. 450 PSIG WATER DUMP SWITCH COMPRESSOR START RELAY FAN SWITCH CONTACTOR CONDENSER CI 275 FAN MOTOR CO 205 208/230 VOLTS 60 Hz FIGURE 5. WIRING DIAGRAM IAF1000 630460004...
Crankcase Heater (IRF Only) Control Low Pressure ON-OFF Switch CI 20 PSIG Circuit Breaker CO 10 PSIG Rated 1.5 Amps Gear Motor Start Relay Delay Thermostat Thermostat Cooling Fan Motor Water Dump Valve Control High Pressure CO 450 PSIG Water Dump Switch Compressor Run Compressor Start...
ON–OFF SWITCH CIRCUIT BREAKER RATED 2.0 AMPS CONTROL LOW PRESSURE C.I. 20 PSIG C.O. 10 PSIG GEAR MOTOR START RELAY THERMOSTAT DELAY GEAR THERMOSTAT WATER DUMP COOLING VALVE FAN MOTOR IWF ONLY CONTROL HIGH PRESSURE C.O. 450 PSIG WATER DUMP CONDENSOR FAN MOTOR SWITCH LOW AMBIENT...
The condenser fan may cycle off during the harvest cycle – this would be normal. Note: Installing an IMI Cornelius remote flaker with other than an IMI Cornelius remote condenser and line set may be reason to void the warranty.
Page 18
4. Each condenser and flaker is connected with two (2) *pre- charged lines. a. The pre-charged lines are ordered separately from the condenser to suit each individual application. b. The pre-charged line lengths are 20 feet [6.096 meters], 35 feet [10.66 meters] and 55 feet [16.76 meters]. Note: *(Pre-charged is defined as a vapor holding charge –...
NOTE: MAX. LINE-SET Line-Set Rise: 35 Ft. Maximum [10.66 meters] LENGTH FOR IMI CORNELIUS Line-Set Drop: 15 Ft. Maximum [4.57 meters] FLAKERS IS 55 FT. 2. Calculated Line-Set Distance: 100 Ft. [30.48 meters]...
Page 20
Maximum Line-Set Distance Formula a. Measured rise x 1.7= Calculated Rise 35 ft. Max) [10.66 meters] b. Measured drop x 6.6= Calculated Drop 15 ft. Max) [4.57 meters] c. Measured Horizontal Distance = actual measurement. d. Total Calculated Distance (A+B+C)=Total Calculated Distance (100 ft.
Page 21
will not be necessary (refer to illustration). However, when shortening or lengthening is required, do so before connect- ing the line-set to the ice machine or the remote condenser. This prevents the loss of refrigerant from the ice machine or the condenser.
Head Pressure Control [Headmaster] The Cornelius “I” series remote systems use an Alco Head Pressure Control, normally referred to as a headmaster. This control is mounted in the remote condenser with a fan cycling control switch. Using both these controls gives the system positive operation under a wide range of condensing temperatures.
Remote System Evacuation/Re-charge All field repairs to the sealed system must start with a total dis- charge of the system following the requirements of the Clean Air Act of July, 1992. Proper evacuation of the total remote system will require a three (3) point hook-up of your manifold and hose set, (see drawing): Point #1 - flaker receiver outlet valve Point #2 - flaker high side service valve...
Page 24
2ND STAGE CHARGING 1ST STAGE CHARGING EVACUATION COMPRESSOR OPERATING MANIFOLD SET MANIFOLD SET OPEN OPEN MANIFOLD SET OPEN CLOSED CLOSED OPEN OPEN CLOSED CLOSED RECEIVER RECEIVER HIGH SIDE HIGH SIDE RECEIVER HIGH SIDE SERVICE SERVICE SERVICE VALVE VALVE VALVE OPEN OPEN CLOSED SIDE...
Page 25
4. *After proper evacuation hold test has been performed, the refrigerant charge should be “dumped” into the receiver until the pressure equalizes, stopping the flow. Do not try to throttle the refrigerant flow. Doing so will allow system pressure to balance too soon. The high-side service valve should be closed and the balance of the charge fed slowly through the suction side service valve with the compressor operational.
Page 26