Verify The Switch Operates Correctly - HP ProCurve 2224 Installation Manual

Switches and hubs
Table of Contents

Advertisement

Installing the Switch 2224
Installation Procedures

3. Verify the Switch Operates Correctly

After you have optionally installed a transceiver module, but before mounting
the switch in its network location, you should first check that it is working
properly by plugging it into a power source and verifying that it passes its self
test.
1.
N o t e
The Switch 2224 does not have a power switch. It is powered on when the
power cord is connected to the switch and to a power source.
The switch automatically adjusts to any voltage between 100-127 volts and
200-240 volts and either 50 or 60 Hz. There are no voltage range settings
required.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
2.
2-6
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a nearby properly grounded
electrical outlet.
Connect power cord to
the power connector
Check the LEDs on the switch. The LED behavior is described on the next
page.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents