After you have optionally installed a transceiver, but before mounting the
switch in its network location, you should first check that it is working
properly by plugging it into a power source and verifying that it passes its self
test.
1.
N o t e
The Switch 2124 does not have a power switch. It is powered on when the
power cord is connected to the switch and to a power source. For safety, the
power outlet should be located near the switch installation.
The switch automatically adjusts to any voltage between 100-240 volts and
either 50 or 60 Hz. There are no voltage range settings required.
If your switch requires a different power cord than the one supplied with the
switch, please see the Installation Precautions on page 2-3.
2.
2-6
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a nearby properly grounded
electrical outlet.
Check the LEDs on the switch. The LED behavior is described on the next