Epson L200 Service Manual page 24

Color inkjet printer
Hide thumbs Also See for L200:
Table of Contents

Advertisement

L200/L201/L100/L101
Power Supply Unit
Hole
Power Supply Unit
Power Supply Unit Cable
Power Supply Unit
Route the Power Supply Unit cable through the hole of the Frame
Base.
Left Side
Main Frame
1
Lower part of 80-column side
Grounding Spring
TBD
Main
Frame
Hole
Bracket
Hook
When installing the Grounding Spring of the lower part of the 80-digit side, follow the instruction below.
1. Insert the tip of the spring to the hole of the Frame Base.
2. Attach the eye of the spring to the Bracket and secure the other eye to the hook on the Main Frame.
When installing the Extension Spring of the lower part of the 0-digit side, attach the tip of the Extension Spring to the hole of the Frame Base
first. Then attach the leg of the spring to the cutout of the Main Frame from the left side as seen from the rear of the printer.
Tighten the screws in the order indicated in the figure above.
Disassembly/Assembly
FFC Cover
Groove
Groove
FFC Cover
FFC Cover
Head FFC
Insert the folded part of the Head FFC into the groove of the FFC
Cover.
Main Frame
Right Side
2
Lower part of 0-column side
Extension Spring
Cutout
Hole
C.B.P-TITE SCREW 3x8 (5.0 ± 0.5 kgf·cm)
C.B.S-TITE SCREW 3x5 (7.5 ± 0.5 kgf·cm)
Details of Disassembling/Reassembling by Parts/Unit
Step 1
Head FFC
Cleaner Case Spring
Frame Base
Dowel for temporarily secure
Step 3
Cleaner Case Spring
When installing the Cap Unit, follow the instruction below.
1. Temporarily secure the Cleaner Case Spring to the hook and dowel of the Frame Base.
2. Insert the Waste Ink Tube to the Cap Unit until point A
3. Install the Cap Unit to the Frame Base, and attach the Cleaner Case Spring which is secured temporary earlier to the hook on the Cap Unit.
4. Insert one leg of the Cleaner Lever Spring to the hole of the Frame Base, and secure it to the dowel of the Frame Base, then secure the other leg
to the protrusion of the Lever Cleaner.
CR Scale
Main Frame
4
3
Extension Spring
When installing the CR Scale, confirm that the arrows on both
the edges of the CR Scale face upward.
When installing the Extension Spring, be sure to attach it with
its leg facing the rear of the printer.
Cap Unit
Step 2
Cap Unit
Waste Ink Tube
Hook
Step 4
Cap Unit
Lever Cleaner
Protrusion
Hook
Dowel
Hole
(p 26)
is hidden.
CR Scale
Revision A
Point A
Cleaner Lever Spring
24
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

L101L201L100

Table of Contents