CHECKLIST- I NSTALLATION
LOAD CALCULATION
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
COMBUSTION
AND VENT PIPING
Termination Location
Vent
Roof
Sidewall
Combustion -Air
Roof
Sidewall
Attic
Crawl Space
Termination Kit-2 Pipe or
Concentric
Combustion-Air
Pipe Length
Combustion-Air
Pipe Elbow
Quantity
Vent Pipe Length
Vent Pipe Elbow Quantity
Pipe Diameter Determined from
Sizing Table
Pipe Sloped To Furnace
Pipe Insulation
Over Ceilings
Low-Ambient
Exposed Pipes
Condensate
Drain
Unit Level or Pitched Forward
Internal Tubing Connections
Free of Kinks and Traps
External Drain Connection
Leak
Tight and Sloped
Condensate Trap Primed before
Start- Up
Heat Tape Installed if Required
CHECKLIST
- START-UP
Gas Input Rate (Set Within 2
percent of Rating Plate)
Temperature Rise Adjusted
Thermostat
Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls
Check Operation
CHECKLIST
- START-UP
Gas Input
Rate (Set Within
2
percent
of Rating
Plate)
Temperature Rise Adjusted
Thermostat Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls
Check Operation
Primary Limit
Pressure Switches
51
Need help?
Do you have a question about the Infinity ICS 58MVC 100 Series and is the answer not in the manual?