Assembly; Installation - Jet JMD-15 Owner's Manual

Mill/drill machine
Hide thumbs Also See for JMD-15:
Table of Contents

Advertisement

Assembly

1. Screw rubber handles (A, Fig. 1) onto handle
rod (B, Fig. 1).
downfeed hub (C, Fig. 1) and tighten. Flat
spot on rod accommodates a combination or
adjustable wrench. Note: Handle shafts are
already installed into hub on JMD-18PFN.
2. Repeat for other two rod assemblies.
3. Slide crank (D, Fig. 2) onto shaft and tighten
set screw (E, Fig. 2). Be sure set screw
seats on flat part of shaft.
4. Thread handle (F, Fig. 2) into crank and
tighten.
5. Slide handwheel (G, Fig. 3) onto table
handwheel shaft and tighten set screw.
Insert handle (H, Fig. 3) into handwheel and
tighten.
6. Repeat for two remaining table hand wheels.

Installation

Machine is heavy! Use an
appropriate lifting device and use extreme
caution when moving the machine to its final
location.
Failure to comply may cause
serious injury.
1. The location for the mill/drill should be well lit,
dry, and have room enough to allow the head
to rotate 360°.
2. Before bolting the mill/drill to a bench or
stand, the unit must be level in both
directions. Place a level on the table in both
directions.
3. If the table is not level, shim under the low
corner(s) until level.
bolts.
Check for level again.
necessary until the mill/drill is level after the
fastening hardware has been tightened.
Screw handle rod into
Tighten the fastening
Adjust as
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmd-18pfnJmd-18

Table of Contents