Shaft Link - Oki OKIPAGE8c Maintenance Manual

Led page printer
Hide thumbs Also See for OKIPAGE8c:
Table of Contents

Advertisement

3.3.35 Shaft Link

1.
Remove the eraser bracket assy. (See 3.3.34.)
2.
Remove the gear one-way (Z30). (See 3.3.14.)
Remove the E-ring 3 by sliding the sensor assy T (KCM) 1 and bracket sensor T (KCM) 2
3.
together in the arrow (A) direction.
Release the engagement between the lever Up/Dn and boss A of the lever link (R) 5 by
4.
sliding the spring support (R) 4, lever link (R) 5 and the bearing 6 together in the arrow (B)
direction.
(Keep on sliding until the lever link (R) 5 reaches the end of D-cut part of the shaft link 7.)
Draw out the entire shaft link 7 by pressing it in the arrow (C) direction and turning its left side
5.
under the contact (BL L) assy.
Detach the sensor assy T (KCM) 1, bracket sensor T (KCM) 2, spring support (R) 4, lever
6.
link (R) 5 and the bearing 6 from the shaft link 7.
7.
Remove 2 E-rings 8 then remove the spring support (L) 9 and lever link (L) 0.
[Notice for mounting]
Engagement between the lever Up/Dn and boss A of the lever link (R) 5:
-
Mount the spring support (L) 9 and lever link (L) 0 in the predetermined positions, then clamp
the boss A of lever link (R) 5 with the lever Up/Dn by adding rotating power on the spring
support (L) 9 by rotating the shaft link 7.
Mounting of the spring support (R) 4:
-
Clamp the spring support (R) 4 at the predetermined positions in the lever link (R) 5 and the
contact BKT (R).
8
(D)
0
Remove 7
9
(C)
Slide 7
(A)
Slide 1, 2
Figure 3.3.35 Shaft Link
3 - 42
Boss A
7
1
2
3
Boss A
6
3
4
5
(B)
Slide 4, 5 and 6
Lever Up/Down

Advertisement

Table of Contents
loading

Table of Contents